COMET Estimating provides BIM estimating services for projects across Australia. We extract accurate quantities directly from 3D models to support precise cost planning. BIM data is linked with budgets and schedules to give you better control from the start.
Our process identifies issues early, reduces errors, and improves coordination. You control spending, minimise risk, and deliver projects smoothly and with confidence.
+
Delivered
+
Projects
+
Clients
+
Experience
4+ years of perfection in every project.
With a presence in 50+ global locations.
COMET Estimating creates BIM models that bring Australian projects to life in 3D. Walk through complete buildings digitally. Identify clashes early. Coordinate teams smoothly. Reduce change orders and stay on budget.
Send your Revit files for LOD 300 quantity extraction. We verify model elements and phasing details.
You receive a firm quotation for takeoffs, clash reports, and schedule links. Scope and timelines are clear from the start.
We run detailed model queries including CSI waste factors. Progress is tracked and shared daily.
A detailed BIM takeoff report is delivered, linked to your schedule. Excel exports align with site quantities.
Across Australia, these teams rely on BIM based quantities to plan and deliver projects accurately. Lets see who and how.
Across Australia, general contractors use BIM takeoffs to convert models into accurate quantities. This supports reliable bidding, budgeting, and on site planning.
BIM managers rely on model based quantities to check completeness and coordination. Clear takeoffs support smoother workflows and clash resolution.
Concrete contractors extract slab, wall, and rebar quantities directly from structural models. This improves ordering accuracy and reduces material waste.
Steel teams use model based tonnages and piece counts for pricing and planning. Accurate quantities support fabrication and site sequencing.
MEP contractors extract ducts, pipes, cables, and equipment from coordinated BIM files. Quantities link to schedules for smoother installation.
Design build teams connect design decisions to cost early using BIM estimates. This supports better collaboration and cost control.
Owners track cost impacts of design changes through updated model takeoffs. This helps maintain budget control across project stages.
Cost consultants use BIM quantities as a reliable base for detailed cost planning. Model based data improves accuracy and reporting.
Facility owners use as built models and quantities to plan maintenance and upgrades. Accurate data supports long term asset management.
Public clients rely on BIM based data to set and monitor budgets. Clear quantities support transparency and compliance on complex projects.
Australian contractors choose COMET Estimating because our BIM takeoffs match site reality. Exact Revit-based quantities control budgets tightly and catch clashes before they cause rework.
LOD 300 quantities are extracted from your exact Revit files, aligned with site conditions and phasing.
Clash detection and CSI waste factors prevent material shortages during construction.
Takeoffs link directly to Primavera schedules, supporting confident GMP pricing.
Reports are delivered on time, with same-day updates when designs change.



Whether you handle a few projects or many, our estimating support grows with your business.
We turn BIM files into reliable cost data before GMP locks in. Teams receive Excel outputs, cash flow curves, and change logs to keep estimates current.
We build long-term trust by delivering model-based estimating across the full project lifecycle. Accuracy comes from complete element queries, CSI waste factors, and build-ready outputs.
BIM estimating uses 3D digital models to create detailed and accurate cost estimates for construction projects. The data extracted from these models helps calculate materials, labor, and equipment costs, ensuring the estimate is precise and up-to-date.
BIM eliminates human error by automating the process of data extraction. This provides real-time, accurate data based on the most recent design updates, making the estimates much more reliable than traditional methods.
Not at all. BIM estimating is useful for projects of all sizes, from small residential renovations to large commercial developments. It offers value for any project by providing precise and accurate cost estimates.
The cost of BIM estimating varies depending on the complexity and size of your project. On average, prices range from $1,000 to $8,000, with larger, more complex projects requiring more detailed analysis.
We use several industry-leading BIM tools, including Revit, Navisworks, CostX, and Bluebeam, to deliver accurate, reliable estimates.
Yes, BIM’s clash detection feature allows us to identify conflicts between building systems early on. This helps to resolve issues before construction begins, saving time and reducing costs.
BIM can be used to identify sustainable building materials and energy-efficient systems. It helps reduce the environmental impact of your project while lowering long-term operating costs.
“Revit quantities matched site counts perfectly. We saved 8% on material orders.”
59 King Road, HARKAWAY, VIC, 3806
Monday - Friday
09:00 AM Until 05:00 PM